Ball valves Elephant BV3232P(4pc)-SP-3WL-T-ISO-H, body material - Stainless steel AISI 316, seal - PTFE / PTFE / Teflon, with pneumatic actuator double action PA-DA, 4V320-08 220V, BKV APL-410N Ex
Ball valves Elephant BV3232P(4pc)-SP-3WL-T-ISO-H, body material - Stainless steel AISI 316, seal - PTFE / PTFE / Teflon, with pneumatic actuator double action PA-DA, 4V320-08 220V, BKV APL-410N Ex - DN10 / 63 bar est en rupture de stock et sera expédié dès qu’il sera de retour en stock.
Impossible de charger la disponibilité pour le Service de retrait
Livraison et expédition
Livraison et expédition
Les frais de livraison sont déterminés lors du processus de paiement et varient en fonction de plusieurs facteurs, notamment le type de produit, le délai de livraison, le fournisseur de services et le pays de destination.
Description
Description
The Elephant BV3232P(4pc)-SP-3WL-T-ISO-H ball valve is used as a shut-off valve in heat supply systems, water supply systems, in steam, fuel and pneumatic systems with compressed air and neutral gases. Installation of BV3232P(4pc)-SP-3WL-T-ISO-H series valves is possible in systems transporting liquid and gaseous media (water, oil, oils, steam, air, alcohols, glycol, etc.), non-aggressive to the valve materials.
The Elephant PA-DA double-acting pneumatic actuator is designed to automate the process of controlling industrial shut-off valves - gates, ball valves. Elephant pneumatic actuators are designed for use both indoors and outdoors. All internal and external parts have an anti-corrosion coating.
Pneumatic distributor Elephant 4V320-08 220V is used to change the direction, start, stop the flow of compressed air in the pneumatic system depending on the external control action.
The Elephant APL-410N EX limit switch unit is an electrical device designed to open and close the working circuit and to visualize the positions of the shut-off element of pipeline valves. As a rule, a sealed box contains two mechanical switches rated for up to 250 V, which monitor the position of the actuator rod and signal in extreme positions. They are mounted on top of the actuator surface. In the upper part of the limit switch unit there is a two-color hemisphere of the visual indicator. If the connected pipeline valve is closed, then only the red part of the hemisphere with the inscription CLOSED is visible; if open, only the yellow part with the inscription OPEN. This visual indicator is clearly visible from afar, which simplifies the inspection of the equipment, and the color difference between the open and closed positions reduces the likelihood of erroneous perception of information. Thanks to the use of the BKV, it becomes possible to transmit information about the position of pipeline valves (open/closed) to automated control systems, which increases the reliability of the system as a whole and simplifies diagnostics when faults are detected.
Technical parameters of ball valves Elephant BV3232P(4pc)-SP-3WL-T-ISO-H with double-acting pneumatic actuator PA-DA, pneumatic valve 4V320-08 220V, BCV APL-410N EX:
Name | Meaning |
Working environment temperature, °C | from -20 to 200 |
Type of crane device | three-way |
Three-way valve type | L |
Application | water supply, heat supply, steam supply |
Working environment | water, steam, petroleum products, neutral media |
Connection to the pipeline | coupling (threaded) |
Water intake | No |
Type of flow section | standard pass |
Control type | With pneumatic drive |
Joining | Internal thread |
Control | double acting pneumatic actuator |
Availability of limit switches | There is |
Availability of pneumatic distributor | There is |
Sketch of ball valves Elephant BV3232P(4pc)-SP-3WL-T-ISO-H with double-acting pneumatic actuator PA-DA, pneumatic valve 4V320-08 220V, BCV APL-410N EX
Dimensions and sizes of ball valves Elephant BV3232P(4pc)-SP-3WL-T-ISO-H with double-acting pneumatic actuator PA-DA, pneumatic distributor 4V320-08 220V, BKV APL-410N EX:
DN, mm | L, mm | F, mm | L1, mm | G, mm |
10 | 71 | 98 | 153 | 147 |
15 | 71 | 98 | 153 | 147 |
20 | 82 | 98 | 153 | 147 |
25 | 98 | 98 | 153 | 147 |
32 | 118 | 98 | 153 | 147 |
40 | 122 | 115 | 174 | 147 |
50 | 150 | 115 | 174 | 147 |
65 | 178 | 135 | 216 | 147 |
80 | 202 | 135 | 216 | 147 |
100 | 231 | 135 | 216 | 147 |
Sketch of parts and materials of ball valves Elephant BV3232P(4pc)-SP-3WL-T-ISO-H
Table of parts and materials of ball valves Elephant BV3232P(4pc)-SP-3WL-T-ISO-H:
Item No. | Part name | Material | Quantity |
---|---|---|---|
1 | Lid | SS316 | 3 |
2 | Saddle rings | PPL | 4 |
3 | Laying the connection | PTFE/RPTFE | 3 |
4 | Thrust washer | PTFE/RPTFE | 1 |
5 | Sealing | PTFE | 1 |
6 | Stock | SS304/SS316 | 1 |
7 | Seal | SS304 | 1 |
8 | Ball valve | S304/S316 | 1 |
9 | Frame | SS316 | 1 |
Technical parameters of the PA-DA double-acting pneumatic actuator:
Name | Meaning |
Model | PA-DA |
Design | double acting |
Control pressure, bar | 2 ÷ 8 |
Sketch of parts and materials of Elephant PA-DA double-acting pneumatic actuator
Table of parts and materials of the pneumatic actuator Elephant PA-DA double acting:
No. | Name | Material |
1 | Frame | extruded aluminum |
2 | Side plugs | cast aluminum |
3 | Gear | stainless steel |
4 | Piston | steel/aluminum |
5 | Plugs | stainless steel |
6 | Piston ring | NBR |
7 | Springs | spring steel |
8 | Piston bearing | engineering plastic |
9 | Piston ring | NBR |
10 | Plug | NBR |
11 | Thrust ring | engineering plastic |
12 | Ring | engineering plastic |
13 | Washer | stainless steel |
14 | Spring clamp | stainless steel |
15 | Indicator | plastic |
16 | Indicator housing | plastic |
17 | Bearing | engineering plastic |
18 | Cam | steel |
19 | Bearing | NBR |
20 | Bearing | engineering plastic |
21 | Bearing | engineering plastic |
22 | Sealing ring | NBR |
23 | Sealing ring | NBR |
24 | Bearing | stainless steel |
25 | Adjusting nut | stainless steel |
26 | Adjustment screw | stainless steel |
27 | Sleeve | aluminum |
Technical parameters of the Elephant 4V320-08 220V pneumatic valve
Name | Meaning |
Type of pneumatic distributor | spool valve |
Model of pneumatic distributor | 4V320-08 220V |
Working pressure, bar | 1.5 ÷ 1.8 |
Supply voltage, V | 220 V |
Response frequency, cycles/sec | 5 |
Limit Switch Block Elephant APL-410N EX
Technical parameters of the limit switch unit Elephant APL-410N EX
Name | Meaning |
Limit switch block model | APL-410N EX |
Service life, years | 10 |
Table of parts and materials of the limit switch block Elephant APL-410N EX:
Item No. | Detail | Material |
1 | Visual indicator | ABS plastic / polycarbonate |
2 | Visual indicator cover | polycarbonate |
3 | Label | |
4 | Cover screws | stainless steel |
5 | BKV housing cover | aluminum die casting |
6 | Shaft | stainless steel |
7 | Limit switches | |
8 | Cams (eccentrics) | polycarbonate |
9 | BKV case | aluminum die casting |
10 | Terminal block | |
11 | Ground terminal | stainless steel |
12 | Hole (thread) for cable entry | |
13 | bracket | stainless steel |
Avis (0)
Avis (0)
Documentation
Documentation
Paiement et sécurité
Moyens de paiement
Vos informations de paiement sont gérées de manière sécurisée. Nous ne stockons ni ne pouvons récupérer votre numéro de carte bancaire.
Questions fréquemment posées
Expédition
Dans quels pays expédiez-vous ?
Dans quels pays expédiez-vous ?
Nous proposons actuellement des livraisons en France et dans toute l'UE, ainsi que des options de livraison internationales. Si vous avez une destination spécifique en tête qui n'est pas répertoriée, n'hésitez pas à nous contacter pour plus d'informations.
Combien de temps faudra-t-il pour recevoir ma commande ?
Combien de temps faudra-t-il pour recevoir ma commande ?
L'expédition standard prend normalement 3 à 7 jours. L'expédition le lendemain est disponible pour toutes les commandes nationales (moyennant des frais supplémentaires). Les délais d'expédition internationaux dépendent des produits et de la destination (estimés au moment du paiement).
Retours et remboursements
Comment retourner un produit ?
Comment retourner un produit ?
Les articles doivent être retournés dans les 30 jours suivant la réception de votre commande. Les articles doivent être retournés dans le même état dans lequel ils ont été reçus, ne pas être portés/utilisés, avoir toutes les étiquettes encore attachées et inclure tous les emballages d'origine.
Combien de temps faudra-t-il pour recevoir mon remboursement ?
Combien de temps faudra-t-il pour recevoir mon remboursement ?
Les remboursements sont traités dans les 7 jours suivant la réception des articles.